Email: Info@NapoliConstructionLLC.com Call: 856-202-5816

Portfolio Post 1

WL Gore – Elk Mills II Facility Additions

Owner:             WL Gore
Location:          Elkton, MD
Contract $:       $90,000
Duration:          Design-1 month; Construction 1 month
Completed:      November, 2011
Description:     This project was a hybrid conventional and pre-engineered structures consisting of 2 additions to an occupied facility.  The first was a traditional lean-to type and the second was a single slope structure built on top of the existing roof to allow easier maintenance of their mechanical units.


 
GWCC logo